Customization: | Available |
---|---|
After-sales Service: | Online |
Warranty: | 1 Year |
Still deciding? Get samples of US$ 1500/Piece
Request Sample
|
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Technical characteristics
1. Technical features
ED0508C SF6 comprehensive gas tester is set dew point (micro water) tester, purity analyzer, gas decomposition product tester in one, the original to use three instruments to achieve the function, concentrated in one instrument.One on-site measurement can complete the detection of three indicators, greatly saving the gas in the equipment, a measurement saves 2/3 of the gas consumption, while reducing the user's workload, improve the work efficiency.
¨ Fast gas saving: after starting up and entering the measurement state, the time of dew point measurement is about 5min, and the time of purity and decomposition is about 2min.
¨ self-locking joint: the self-locking joint imported from Germany is safe and reliable without air leakage.
¨ Data store: A large-capacity design that stores a maximum of 800 groups of test data.
¨ curve function: large screen curve display dew point measurement process.
¨ Clear display: the LCD directly displays dew point, moisture content (PPM), purity, H2S, SO2, CO and HF contents, environmental temperature, environmental humidity, time and date, etc.
¨ Built-in power supply: built-in 8000mAh rechargeable lithium battery, a sufficient use of 10 hours.
¨ Printing function: miniature thermal printer (printer optional)
Gas Quantitative Analyzer Gas System Inspecting Detector Gas Concentration Leak Detector Tester Leakage Analyzer Device
Technical parameters
Purity |
measurement range |
0%~100% |
|||
Measurement accuracy |
±0.5% |
||||
measurement time |
less than 2 minutes |
||||
Dew point |
Measuring range |
-80 °C~+20 °C |
|||
Measurement accuracy |
±1°C(-60°C~+20°C);±2°C(-80°C~-60°C) |
||||
The response time (+ 20 ºC)
|
63% 5 seconds, 90% 45 seconds (-60ºC ~ +20ºC) 63% 10 seconds, 90% 240 seconds (+20ºC ~ -60ºC)
|
||||
H2S |
Measuring range |
1 ~ 200 ppm |
|||
Minimum amount of detection |
≤0.1ppm |
||||
Accuracy |
±0.5% |
||||
Stability |
0~200ppm |
||||
Repetitive |
≤2% |
||||
SO2 |
Measuring range |
1~100ppm |
|||
Minimum amount of detection |
≤0.1ppm |
||||
Accuracy |
±0.5% |
||||
Stability |
0~200ppm |
||||
Repetitive |
≤2% |
||||
CO |
Measuring range |
1~500ppm |
|||
Minimum amount of detection |
≤0.1ppm |
||||
Accuracy |
±0.5% |
||||
Stability |
0~500ppm |
||||
Repetitive |
≤2% |
||||
HF |
Measuring range |
1~100ppm |
|||
Minimum amount of detection |
≤0.1ppm |
||||
Accuracy |
±0.5% |
||||
Stability |
0~500ppm |
||||
Repetitive |
≤2% |
||||
Display |
device 3.5-inch color LCD |
operating temperature |
-40ºC to +60ºC |
||
Ambient temperature |
-40ºC ~ +70ºC |
electric quantity |
display full degree ratio |
||
Ambient temperature |
-30 ~ + 60% RH |
Printing function |
Thermal micro printer (optional) |
||
Power |
AC 220V |
Date display |
year, month, day |
||
Built-in rechargeable battery |
Time display |
hours, minutes, seconds |
Gas Quantitative Analyzer Gas System Inspecting Detector Gas Concentration Leak Detector Tester Leakage Analyzer Device
Instrument panel description
1. Front panel
Note: Press the support adjustment buttons on both sides to adjust the Angle of the support
2. Rear panel
3. measurement
1. Connect the SF6 device
Connect the thread end of the measuring pipe with the switch connector, tighten it with a wrench, and close the needle valve on the other end of the measuring pipe;
Then the quick connector on the test pipe is inserted into the sampling port on the comprehensive tester;Connect the exhaust pipe to the air outlet;
Finally, connect the switch connector with the measurement interface of SF6 electrical equipment, and tighten it with a wrench.
2. Initialize
Turn on the power switch of the instrument, and the instrument enters the initial self-calibration process.
3, check the power
Alternating current is preferred for this instrument.
When using DIRECT current, please check the battery level displayed in the upper right corner. If the battery level is lower than about 20%, please shut down and charge and continue to use.
4. Start measuring
After completing the initial self-calibration, the instrument automatically enters the measurement state (press the "left" and "right" keys to switch between the main measurement page and the dew point measurement page). At this time, open the flow valve on the front panel of the comprehensive tester, and then adjust the needle valve on the measurement pipe.
The first measurement (SF6 moisture) takes 5 ~ 10 minutes, and each subsequent measurement takes 3 ~ 5 minutes.
When the SF6 dew point is measured separately, the flow rate is adjusted to about 0.5L/min.
When measuring purity, H2S, SO2, CO and HF contents, the flow rate should be adjusted to about 0.3L/min.
5. Store data
After measuring the equipment, you can save the data in the instrument and press "OK" to call up the operation menu. See the following section for specific operation methods.
6, after the measurement, close the needle valve on the measuring pipe and the regulating valve on the comprehensive tester.
Remove the adapter from the SF6 electrical equipment.If you need to continue measuring other equipment, please do not turn off the power of the instrument and follow the steps above for the next measurement.
7. After the measurement, turn off the power of the comprehensive tester.
4. Menu operation
In the measurement state, enter the function menu through the Enter key, as shown in Figure 1.
Figure 1.
Gas Quantitative Analyzer Gas System Inspecting Detector Gas Concentration Leak Detector Tester Leakage Analyzer Device
Use
1. Save the data
In the measurement state, press OK to enter the function menu. Press Up and Down to select Save Record. Press OK to enter the page for saving data.
The device number can contain a maximum of five digits. You can press the Up and Down keys to increase the value, and press the Left and right keys to adjust the data bits.
After entering the number, press "OK" to automatically return to the measurement page after saving the data. Press "Cancel" to return to the function menu and do not save the data at this time.
2. View records
In the measurement state, press THE "OK" key to enter the function menu. Press the "Up" and "Down" keys to select the "View Record" menu. Press the "OK" key to enter the view record page.
The display starts with the last data saved.You can press the "up" and "down" keys to view data.
3. Delete records
In the measurement state, press "OK" to enter the function menu. Press "Up" and "Down" to select the "Delete Record" menu. Press "OK" to delete all data.You can press Cancel to return to the function menu without deleting data.
4. Change the time
In the measurement state, press "OK" to enter the function menu, press "Up" and "Down".
Press "OK" to enter the modify time page. You can modify the year, month, day, hour, and minute as follows:
The "Up" and "Down" keys can increase or decrease the value, and the "Left" and "right" keys can move left or right to change the position.
After modification, press "OK" to save the modified value and automatically return to the measurement page; press "Cancel" to abandon the modified value and automatically return to the function menu.
Five, matters needing attention
The device should be placed in a safe position to prevent breakage and vibration.
A device should be charged promptly before being used at a cost.
To charge a device, you simply plug the power cord into a 220V socket, without switching on the power switch, and the device automatically charges itself, which typically takes more than five hours.
When not in use, the instrument should be put into an aluminum alloy packing box and placed on the test stand or instrument rack to protect against dust and moisture.
The X-ray instrument is calibrated once a year with a standard gas.Can be sent to the manufacturer or authorized units for calibration, to ensure accuracy.
According to the principle, when the concentration of H2S in the detected gas is high, the remaining gas in the airway should be removed for the next measurement.
When the concentration of H2S in the detected equipment exceeds the normal value, it is recommended to measure twice to confirm the result.
Attached to the record:(Requirements for measuring water content of sulfur hexafluoride circuit breakers)
Test content |
Standard (μ L/L, 20ºC) |
Sulfur hexafluoride circuit breaker factory and overhaul (before the whole assembly) should be measured breaking unit and prop unit moisture value. |
≤150 |
The water value of the circuit breaker shall be measured by the inflatable interface at the bottom of the prop. |
≤150 |
In operation, the water value of circuit breaker is measured by the inflatable interface at the bottom of the prop.The test cycle shall be regulated according to the "pre-test procedure". |
≤200 |
During operation, when it is necessary (the breaking unit leaks air and disconnects the breaking unit), the water content of the opening chamber should be measured separately from the self-sealing joint in the coupling box. |
≤300 |
Gas Quantitative Analyzer Gas System Inspecting Detector Gas Concentration Leak Detector Tester Leakage Analyzer Device
Packing list
Integrated gas tester |
1 |
Test pipe with needle valve |
1 (3 m in length) |
Gas pipeline |
1 (3 m in length) |
Power cord |
1 |
Aluminum alloy shockproof box |
1 |
Operating instruction |
1 |
Delivery inspection report |
1 |
Certificate of approval |
1 |
Crossover sub |
1 |