Customization: | Available |
---|---|
After-sales Service: | Online After-Sales Service |
Power Supply: | 220V |
Suppliers with verified business licenses
Audited by an independent third-party inspection agency
Model | A | B | C |
Inner size(mm) | 800*800*800 | 1000*1000*1000 | 1000*1000*1500 |
Species | Talcum powder | ||
Duration time | 2hours or 8 hours | ||
Test temperature | RT~7ºC | ||
Test humidity | 45%-75%RH | ||
Nominal diameter of metal screen mesh |
50μm |
||
Nominal spacing between lines |
75μm |
||
Windspeed | ≤2m/s | ||
Dust concentration | 2~4Kg/m3 | ||
Dust requirements | Meet with JIS6 requirement(Or national standards) | ||
Oscillator period | 0-99H99M99S | ||
Blowingdustset | The time of continuous and periodic dusting is determined arbitrarily | ||
External material | High quality cold rolled steel sheet electrostatic spraying | ||
Inner material | SUB304Precision welding of quality stainless steel plate | ||
Thermalinsulationmaterial | Ultrafine glass fiber cotton | ||
Safety protection | Overtemperature and overlimit alarm protection,power leakage,short circuit,lack of phase protection,undervoltage protection | ||
Power | AC220/380V±10%,1PH,50/60HZ | ||
Standardconfiguration | Vacuum pump one,gas flowmeter,air source excuse,pressure gauge,oil and water separator |
LR-B012 Dust test machine parameters | |
1.Product features | 1,the structure design of the test system is advanced and reasonable,in line with:GB2423,GB4706,GB4208,DIN 2,the main functional components of the test box are equipped with world famous brand,advanced and reliable technology principle,the best control of noise and energy saving--its performance can replace similar foreign products. 3,color touch screen man-machine interface,programmable controller,automatic operation control of the whole machine. |
2.Parameter specification: | |
Nominal content product: | 216L |
Box size in test area: | 60*60*60(cm) |
Overall dimensions: | 120*110*85(cm) |
Weight: | 90KG |
3.Performance parameter: | |
Test environment condition: | The ambient temperature ranges from+5°C to+28°C,and the relative humidity ranges from 85%to less |
Test method: | GB2423,GB4706,GB4208,DIN |
Conform to: | IEC60529-2013, |
Display: | There are flowmeters and vacuum meters on the equipment,which can be displayed during operation |
Have | There are vacuum pump pressure and pressure adjustment readings |
Dust blowing principle: |
|
Box temperature: | 15-45ºC(not displayed) |
Relative humidity in the box: | 45%~75%RH(not displayed) |
Nominal wire diameter of the network: | 50um |
Nominal spacing between lines: | No more than 70um |
Airflow speed: | ≤2m/s(not displayed) |
Dust blowing time: | 0~9999.9h configurable |
Sensor: | Test chamber temperature sensor:PT100,dust temperature sensor:PT100 |
Vibration time: | Adjustable for 1 to 9999min |
Test time: | 1min~99h59min |
Dust blowing time: | The dust vortex air pump,dust vibration motor and test time can be controlled respectively |
Dust blowing cycle: | Continuous and periodic blowing time is set at will |
Strike time: | Vibration and stop vibration time automatically alternate |
Dust baking system: | 1.High temperature nickel-chromium wire,heating fast |
2.PT100 temperature sensor,PTD+SSR control,plus temperature switch protection | |
Dust blowing system: | 1.Vortex type air pump,low noise,strong power 2.Overcurrent protection device to prevent damage caused by bad working conditions |
Vacuum system(optional): |
1.High efficiency vortex vacuum pump,low noise,low energy consumption 2.Micro flowmeter,directly display the sealing degree of the measured item 3.Independent vacuum pressure gauge and system differential pressure gauge,system pressure parameters at a glance 4.Differential pressure switch drives the throttle solenoid valve to accurately control the system pressure 5.Dust filter in pipeline line,easy disassembly and maintenance,improve the service life of vacuum pump 6.Add flow control valve to adjust system pressure freely |
4.Controller: | 1.7-inch,800 x 600 lattice,TFT color LCD display 2.Chinese and English menus(optional)Enter on the touch screen |
3.Function of fault alarm,cause and handling prompt 4.Power off protection function 5 Upper and Lower limit temperature protection function 6.Calendar timing function(automatic start and stop operation) |
|
5.Box structure: | Test area,instrument electric control area,machine room partition design,modular combination,to meet the test and maintenance of humanity Operation,the bottom of the box using high quality fixed PU movable wheel,easy to move customers. |
6.Box material: | 1.Outer bile material:high-quality color steel plate electrostatic spraying |
2.Liner material:high quality heat and cold resistant stainless steel plate | |
7.Test box door: | Single hinged door(left hinge,right handle when facing box)silicone rubber pressing seal device with large view Inspection window with stainless steel wiper |
8.Environmental Conditions: | 1.Temperature:5ºC~28ºC 2.Relative humidity:≤85% 3 air pressure:86kPa~106kPa |
9.Power supply conditions: |
AC220V power supply requirements: 1.Single-phase two-wire+PGND cable 2.Voltage range:AC(220±10)V 3.Allowed frequency fluctuation range:60Hz 4.The ground resistance of the PGND cable is less than 4 ohms 5.The user is required to configure the air or power switch of the corresponding capacity for the equipment at the installation site,and the switch must be It is used independently for this device |
10.Maximum current: Maximum power consumption: |
10A 2KW (Data obtained after testing at ambient temperature+25ºC,without sample,and stable operation condition for one hour) |