• Kdyd-Mf Transformer Sealing Drying Testing Machine
  • Kdyd-Mf Transformer Sealing Drying Testing Machine
  • Kdyd-Mf Transformer Sealing Drying Testing Machine
  • Kdyd-Mf Transformer Sealing Drying Testing Machine
  • Kdyd-Mf Transformer Sealing Drying Testing Machine
  • Kdyd-Mf Transformer Sealing Drying Testing Machine

Kdyd-Mf Transformer Sealing Drying Testing Machine

After-sales Service: Online
Warranty: 1 Year
Type: Transformer Sealing Drying Testing Machine
Control: Computer Control
Weight: 0-100Kg
Power Source: AC220V
Customization:
Diamond Member Since 2023

Suppliers with verified business licenses

Trading Company

Basic Info.

Model NO.
KDYD-MF
Transport Package
Plywood Case
Trademark
LONROY
Origin
China
HS Code
9024800000
Production Capacity
200pieces/Month

Product Description

KDYD-MF Transformer sealing drying testing machine
Summary of transformer sealing drying test equipment
Since the sealing performance of the transformer, reactor, arc suppression coil (hereinafter referred to as the transformer) directly affects the factory test and field operation, it is necessary to ensure that the transformer is sealed, that is, to carry out the sealing test, which requires no leakage and damage after 12 hours. Our company is specially equipped with this test device, according to the national standard DL/T264-2012 and GB/T 6451, to detect whether the transformer is leaking under the specified conditions.

The technical requirements of 6kV and 10kV oil-immersed transformers in the national transformer standards put forward that the transformer should be sealed in operation, which requires the transformer to ensure that the transformer is sealed in the manufacturing process, that is, the sealing test is carried out, and there is no leakage and damage after 12 hours, among which the transformer of the corrugated tank (including the transformer with the elastic plate radiator tank). The test pressure is specified as: 315kVA and below should be subjected to 20kPa test pressure; 400kVA and above should be subjected to 15kPa test pressure.

KDYD-MF Transformer sealing drying testing machine

Serial number Product name specification quantity
1 Permanent magnet variable frequency screw air compressor 7.5KW 1
2 Adsorption dryer 1 cube 1
3 Air holder 0.6 cubic 1
4 Freeze dryer Two cubic 1
5 Precision filter CTA 3
6 Digital standard table 100kPa 1
7 Connecting material   1

 

Summary of transformer sealing drying test equipment
Since the sealing performance of the transformer, reactor, arc suppression coil (hereinafter referred to as the transformer) directly affects the factory test and field operation, it is necessary to ensure that the transformer is sealed, that is, to carry out the sealing test, which requires no leakage and damage after 12 hours. Our company is specially equipped with this test device, according to the national standard DL/T264-2012 and GB/T 6451, to detect whether the transformer is leaking under the specified conditions.

The technical requirements of 6kV and 10kV oil-immersed transformers in the national transformer standards put forward that the transformer should be sealed in operation, which requires the transformer to ensure that the transformer is sealed in the manufacturing process, that is, the sealing test is carried out, and there is no leakage and damage after 12 hours, among which the transformer of the corrugated tank (including the transformer with the elastic plate radiator tank). The test pressure is specified as: 315kVA and below should be subjected to 20kPa test pressure; 400kVA and above should be subjected to 15kPa test pressure.

Transformer sealing drying machine

Serial number Product name specification quantity
1 Permanent magnet variable frequency screw air compressor 7.5KW 1
2 Adsorption dryer 1 cube 1
3 Air holder 0.6 cubic 1
4 Freeze dryer Two cubic 1
5 Precision filter CTA 3
6 Digital standard table 100kPa 1
7 Connecting material   1

 

Summary of transformer sealing drying test equipment
Since the sealing performance of the transformer, reactor, arc suppression coil (hereinafter referred to as the transformer) directly affects the factory test and field operation, it is necessary to ensure that the transformer is sealed, that is, to carry out the sealing test, which requires no leakage and damage after 12 hours. Our company is specially equipped with this test device, according to the national standard DL/T264-2012 and GB/T 6451, to detect whether the transformer is leaking under the specified conditions.

The technical requirements of 6kV and 10kV oil-immersed transformers in the national transformer standards put forward that the transformer should be sealed in operation, which requires the transformer to ensure that the transformer is sealed in the manufacturing process, that is, the sealing test is carried out, and there is no leakage and damage after 12 hours, among which the transformer of the corrugated tank (including the transformer with the elastic plate radiator tank). The test pressure is specified as: 315kVA and below should be subjected to 20kPa test pressure; 400kVA and above should be subjected to 15kPa test pressure.

Transformer sealing drying machine

Serial number Product name specification quantity
1 Permanent magnet variable frequency screw air compressor 7.5KW 1
2 Adsorption dryer 1 cube 1
3 Air holder 0.6 cubic 1
4 Freeze dryer Two cubic 1
5 Precision filter CTA 3
6 Digital standard table 100kPa 1
7 Connecting material   1

 

Summary of transformer sealing drying test equipment
Since the sealing performance of the transformer, reactor, arc suppression coil (hereinafter referred to as the transformer) directly affects the factory test and field operation, it is necessary to ensure that the transformer is sealed, that is, to carry out the sealing test, which requires no leakage and damage after 12 hours. Our company is specially equipped with this test device, according to the national standard DL/T264-2012 and GB/T 6451, to detect whether the transformer is leaking under the specified conditions.

The technical requirements of 6kV and 10kV oil-immersed transformers in the national transformer standards put forward that the transformer should be sealed in operation, which requires the transformer to ensure that the transformer is sealed in the manufacturing process, that is, the sealing test is carried out, and there is no leakage and damage after 12 hours, among which the transformer of the corrugated tank (including the transformer with the elastic plate radiator tank). The test pressure is specified as: 315kVA and below should be subjected to 20kPa test pressure; 400kVA and above should be subjected to 15kPa test pressure.

Transformer sealing drying machine

Serial number Product name specification quantity
1 Permanent magnet variable frequency screw air compressor 7.5KW 1
2 Adsorption dryer 1 cube 1
3 Air holder 0.6 cubic 1
4 Freeze dryer Two cubic 1
5 Precision filter CTA 3
6 Digital standard table 100kPa 1
7 Connecting material   1
Kdyd-Mf Transformer Sealing Drying Testing Machine

Kdyd-Mf Transformer Sealing Drying Testing Machine
Kdyd-Mf Transformer Sealing Drying Testing MachineKdyd-Mf Transformer Sealing Drying Testing Machine

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now

You Might Also Like

Diamond Member Since 2023

Suppliers with verified business licenses

Trading Company
Number of Employees
6
Year of Establishment
2020-01-13